1918 operational278 building151 planned2,347 shown
2,347 events

Mar 2026

2 events · 1.2 GW
📋announcedPlanned2026-03-27
Google Putnam County WV
Google·200 MW·WV·Buffalo

1700 acres.

Search
📋announcedPlanned2026-03-26
CyrusOne Dugway Proving Ground
CyrusOne·1,000 MW·UT·Dugway

1,201 acres on Army base. KKR/BlackRock backed.

Search

Feb 2026

3 events · 1.7 GW
📋announcedPlanned2026-03-01
AVAIO Digital Leo Little Rock
AVAIO Digital·1,000 MW·AR·Little Rock

$6B Phase 1. 760 acres. Up to 1 GW.

Search
📋announcedPlanned2026-03-01
Penzance Bedington WV
Penzance·600 MW·WV·Falling Waters

$4B, 548 acres near VA Data Center Alley.

Search
📋announcedPlanned2026-02-24
Google Rochester MN
Google·80 MW·MN·Rochester

Jan 2026

9 events · 7.4 GW
📋announcedBuilding2026-02-01
Stargate Milam County TX
OpenAI/SoftBank·750 MW·TX·Milam County

SB Energy 595-acre campus. ~1.5 GW.

Search
🏗️broke groundBuilding2026-02-01
Meta Lebanon Campus
Meta·1,000 MW·IN·Lebanon

$10B, 1,500 acres, 13 buildings, LEAP District.

Search
🏗️broke groundBuilding2026-02-01
Rowan Temple TX Campus
Rowan Digital·300 MW·TX·Temple

Construction begun. Operations expected 2027.

Search
📋announcedPlanned2026-02-01
OpenAI/SB Energy Milam County
OpenAI/SB Energy·1,200 MW·TX·Milam County

SB Energy to build and operate 1.2 GW for Stargate JV.

Search
📋announcedPlanned2026-02-01
Soluna Metrobloks Willacy County
Soluna/Metrobloks·300 MW·TX·Willacy County

Project Kati 2. 100+ MW initial, 300+ MW planned.

Search
📋announcedPlanned2026-01-20
Crow Holdings CleanArc Dallas
Crow Holdings/CleanArc·245 MW·TX·Dallas

40 acres, Stemmons Corridor. 70MW initial building late 2027.

Source
📋announcedPlanned2026-01-16
New Era/Primary Digital Texas Campus
New Era Energy/Primary Digital·1,000 MW·TX·Central Texas

Up to 1+ GW hyperscale campus.

Source
🏗️broke groundBuilding2026-01-15
Stargate Saline Township MI
OpenAI/Oracle/Related Digital·1,400 MW·MI·Saline Township

$7-10B "The Barn" campus. 3 buildings x 550K sqft on 250 of 575 acres. 1.4 GW DTE power agreement approved by MPSC. 2,500 union construction jobs. LEED certified.

Search
🏗️broke groundBuilding2026-01-15
xAI MACROHARDRR Southaven
xAI·1,200 MW·MS·Southaven

$20B investment. 2GW Colossus training compute. 41 gas turbines.

Source

Dec 2025

1 events · 1.5 GW
📋announcedPlanned2026-01-01
GridFree AI South Dallas Campus
GridFree AI·1,500 MW·TX·Hill County

First of three sites. >1.5 GW.

Search

Nov 2025

7 events · 4.8 GW
🏗️broke groundBuilding2025-12-01
Vantage Frontier Campus (Oracle/Stargate)
Vantage/Oracle/OpenAI·1,400 MW·TX·Shackelford County

$25B, 1,200-acre, 10 buildings, 3.7M sqft. 250kW+ racks, liquid cooling. Part of Oracle-OpenAI 4.5GW Stargate deal. Gas-powered.

Search
🏗️broke groundBuilding2025-12-01
Stargate Port Washington WI
OpenAI/Oracle/Vantage·1,000 MW·WI·Port Washington

$15B+ Lighthouse campus. 672 acres, 4 data centers, ~1GW. 500 acres developed. 4,000+ construction jobs, 1,000+ permanent. WEC Energy/We Energies power. Vantage $175M infrastructure investment. LEED certified.

Source
📋announcedBuilding2025-12-01
Meta Beaver Dam WI
Meta·150 MW·WI·Beaver Dam

30th global DC. $1B+. 700,000 sqft.

Search
📋announcedPlanned2025-12-01
Energy Storage Solutions Tarboro
Energy Storage Solutions·900 MW·NC·Tarboro

$19.2B Kingsboro campus. 300 acres. DC + energy storage. Groundbreaking Q1 2026.

Search
📋announcedPlanned2025-12-01
Anthropic/Fluidstack NY Campus
Anthropic/Fluidstack·300 MW·NY·New York

$50B US DC investment plan. 800 permanent jobs.

Search
📋announcedPlanned2025-12-01
Vantage Fredericksburg VA4
Vantage·192 MW·VA·Fredericksburg

$2B investment. Brings VA total to 782 MW.

Search
🏗️broke groundBuilding2025-12-01
CleanArc Caroline County VA
CleanArc·900 MW·VA·Caroline County

900 MW grid capacity. First 300 MW by early 2027.

Search

Oct 2025

5 events · 4.7 GW
🏗️broke groundBuilding2025-11-01
Google West Memphis
Google·400 MW·AR·West Memphis

$4B, 1,000+ acres, 5 DC buildings.

Search
📋announcedPlanned2025-11-01
DOE Oak Ridge AI Campus
DOE/Private·110 MW·TN·Oak Ridge

245 acres. Up to 520MW proposed via naval reactors. DOE opening Oak Ridge Reservation for private AI DC development.

Search
📋announcedPlanned2025-11-01
Blue Energy/Crusoe Houston
Crusoe/Blue Energy·1,500 MW·TX·Houston SW

Nuclear startup + Crusoe. Gas initially, SMRs by 2031.

Search
🏗️broke groundBuilding2025-10-31
AWS Richmond County NC
Amazon·500 MW·NC·Hamlet

$10B, 800 acres, 20 buildings.

Source
went liveOperational2025-10-29
AWS Project Rainier
Amazon·2,200 MW·IN·New Carlisle

$11B, 1,200 acres, 30 buildings. 500K Trainium2 chips. Anthropic Claude training.

Search

Sep 2025

5 events · 3.5 GW
🏗️broke groundBuilding2025-10-01
Meta El Paso Data Center
Meta·1,000 MW·TX·El Paso

$10B investment, 1GW AI-optimized campus. Broke ground Oct 2025.

Search
📋announcedPlanned2025-10-01
BorderPlex/Stack Dona Ana County
BorderPlex Digital/Stack·500 MW·NM·Dona Ana County

$165M tax incentive. Near US-Mexico border.

Search
📋announcedPlanned2025-10-01
Berkley Riverfront KC Campus
Berkley Riverfront·500 MW·MO·Kansas City

$100B campus. 6 hyperscale facilities. 1.8M sqft.

Search
went liveOperational2025-09-30
Stargate Phase 1 Texas
OpenAI/Oracle/SoftBank·500 MW·TX·Abilene

$500B Stargate project. First 2 of 8 buildings operational Sept 30, 2025. Oracle Cloud Infrastructure. 450K NVIDIA GB200 GPUs planned. Remaining 6 buildings by mid-2026.

Search
📋announcedBuilding2025-09-23
Stargate Project Jupiter NM
OpenAI/Oracle/STACK·1,000 MW·NM·Santa Teresa

$165B over 30 years. STACK/BorderPlex development. 4 data centers + 2 microgrids. Oracle tenant. $50B first 5 years. 4,000 construction jobs, 1,500 operations. $50M county water/sewer upgrade.

Search

Aug 2025

2 events · 0.8 GW
🏗️broke groundBuilding2025-09-01
AWS Falls Township AI Campus
Amazon·300 MW·PA·Falls Township

$20B PA investment, former steel mill site.

Source
🏗️broke groundBuilding2025-09-01
AWS Salem Township PA
Amazon·500 MW·PA·Salem Township

Part of $20B PA investment. Near Susquehanna nuclear.

Search

Jul 2025

6 events · 3.3 GW
went liveOperational2025-08-01
Meta Kansas City
Meta·250 MW·MO·Kansas City
🏗️broke groundBuilding2025-08-01
Stargate Lordstown OH
OpenAI/SoftBank·750 MW·OH·Lordstown

$3B conversion of former GM plant.

Search
🏗️broke groundBuilding2025-08-01
Applied Digital Polaris Forge 2
Applied Digital·280 MW·ND·Harwood

$3B near Fargo. AI/HPC focused. Liquid cooling.

Search
📋announcedBuilding2025-07-24
Oracle Bloom Energy Fuel Cell DC (NoVA)
Oracle·40 MW·VA·Ashburn

Oracle + Bloom Energy partnership announced Jul 2025. Fuel cells deliver baseload power within 90 days. No water use. Select US OCI DCs.

Search
📋announcedPlanned2025-07-15
Oracle Stargate Midwest Site (TBD)
Oracle/OpenAI·1,000 MW·WI·TBD Midwest

Part of 4.5GW Oracle-OpenAI Stargate deal (Jul 2025). Midwest location not yet disclosed. 25,000+ jobs across all Oracle Stargate sites.

Search
🏗️broke groundBuilding2025-07-04
Fermi America HyperGrid Campus
Fermi America·1,000 MW·TX·Amarillo

5,769-acre campus, 11GW ultimate. Gas+solar+wind+nuclear.

Search

Jun 2025

110 events · 32.3 GW
📋announcedBuilding2025-06-15
Microsoft Boydton Expansion
Microsoft·250 MW·VA·Boydton
📋announcedBuilding2025-06-15
CloudHQ Manassas Campus
CloudHQ·200 MW·VA·Manassas
📋announcedBuilding2025-06-15
Aligned Ashburn
Aligned·120 MW·VA·Ashburn
📋announcedPlanned2025-06-15
Prime Data Centers Ashburn
Prime·200 MW·VA·Ashburn
📋announcedBuilding2025-06-15
CyrusOne Allen
CyrusOne·200 MW·TX·Allen
📋announcedBuilding2025-06-15
Aligned DFW Campus
Aligned·250 MW·TX·Plano
📋announcedBuilding2025-06-15
Meta Mesa Campus
Meta·200 MW·AZ·Mesa
📋announcedPlanned2025-06-15
Google Mesa Campus
Google·250 MW·AZ·Mesa
📋announcedBuilding2025-06-15
Vantage Phoenix
Vantage·180 MW·AZ·Goodyear
📋announcedBuilding2025-06-15
Equinix SV New Build
Equinix·100 MW·CA·San Jose
📋announcedBuilding2025-06-15
Microsoft Altoona Expansion
Microsoft·300 MW·IA·Altoona

$1B+ expansion announced 2025

Search
📋announcedBuilding2025-06-15
AWS Columbus Expansion
Amazon·400 MW·OH·Columbus

$7.8B Ohio expansion announced 2024

Search
📋announcedBuilding2025-06-15
Switch Atlanta
Switch·150 MW·GA·Lithia Springs
📋announcedPlanned2025-06-15
Microsoft Atlanta
Microsoft·200 MW·GA·Atlanta
📋announcedBuilding2025-06-15
Google The Dalles Expansion
Google·300 MW·OR·The Dalles

$1.2B expansion

Search
📋announcedBuilding2025-06-15
Microsoft Quincy AI Expansion
Microsoft·400 MW·WA·Quincy

Major AI training cluster

Search
📋announcedBuilding2025-06-15
Google Lenoir Expansion
Google·200 MW·NC·Lenoir
📋announcedBuilding2025-06-15
AWS Mississippi
Amazon·300 MW·MS·Canton

$10B investment announced 2024

Search
📋announcedPlanned2025-06-15
AWS Louisiana
Amazon·200 MW·LA·Shreveport

Caddo/Bossier Parishes. Part of $12B Louisiana investment.

Search
📋announcedBuilding2025-06-15
Microsoft AI Quincy
Microsoft·500 MW·WA·Quincy

Azure AI/OpenAI training infrastructure

Search
📋announcedPlanned2025-06-15
AWS Columbus AI Cluster
Amazon·500 MW·OH·Columbus

Part of $7.8B Ohio expansion

Search
📋announcedBuilding2025-06-15
Google Pryor Creek Expansion
Google·400 MW·OK·Pryor Creek

$1.5B AI expansion

Search
📋announcedBuilding2025-06-15
CoreWeave Hammond
CoreWeave·200 MW·IN·Hammond

GPU cloud for AI inference

Search
📋announcedBuilding2025-06-15
CoreWeave NoVA
CoreWeave·150 MW·VA·Ashburn

NVIDIA H100/B200 cluster

Search
📋announcedPlanned2025-06-15
Google Kairos SMR Site
Google/Kairos Power·500 MW·ID·Idaho

Google signed first corporate SMR PPA. 500 MW by 2035. Kairos Hermes demo reactor under construction in TN.

Search
📋announcedPlanned2025-06-15
Oracle Stargate SMR Complex
Oracle/OpenAI·1,000 MW·TX·Abilene

Part of $500B Stargate project. Ellison stated: "We have the permits for three SMRs."

Search
📋announcedBuilding2025-06-15
Lancium Clean Campus
Lancium·200 MW·TX·Abilene

Flexible load DC that curtails during grid stress. Partners with crypto miners. Behind-the-meter gas turbines.

Search
📋announcedBuilding2025-06-15
Google Haskell County Campus 1
Google·300 MW·TX·Haskell County

Part of $40B TX investment.

Search
📋announcedBuilding2025-06-15
Google Haskell County Campus 2
Google·300 MW·TX·Haskell County
📋announcedPlanned2025-06-15
Google Armstrong County Campus
Google·300 MW·TX·Armstrong County

SE of Amarillo. Part of $40B TX investment.

Search
📋announcedBuilding2025-06-15
Google Wilbarger County Campus
Google·200 MW·TX·Wilbarger County

Co-located with AES clean power.

Search
📋announcedBuilding2025-06-15
Data City Laredo
Energy Abundance·300 MW·TX·Laredo

50,000 acres. Phase 1: 300MW. Ultimate 5GW. BTM hydrogen+gas+solar.

Search
📋announcedBuilding2025-06-15
Crusoe-Microsoft AI Factory Abilene
Crusoe/Microsoft·900 MW·TX·Abilene

2 buildings + 900MW on-site power plant. Adjacent to Stargate.

Search
📋announcedPlanned2025-06-15
Infrakey Lacy Lakeview Campus
Infrakey·1,200 MW·TX·Waco

$10B on 520 acres. 1.2GW gas-fired plant.

Search
📋announcedBuilding2025-06-15
Apple Houston AI Server Factory
Apple·50 MW·TX·Houston

250K sqft. Foxconn partnership.

Search
📋announcedBuilding2025-06-15
AWS Round Rock Campus
Amazon·100 MW·TX·Round Rock

149-acre site.

Search
📋announcedPlanned2025-06-15
Amazon Project Spectrum
Amazon·500 MW·TX·Granbury

21-building campus, 1,265 acres. Powered by Comanche Peak Nuclear.

Search
📋announcedBuilding2025-06-15
CyrusOne Fort Worth DFW7
CyrusOne·200 MW·TX·Fort Worth

$200M, 1.9M sqft. Eolian battery co-location.

Search
📋announcedBuilding2025-06-15
CloudHQ SAT Campus
CloudHQ·600 MW·TX·San Antonio

600MW across 5 data centers.

Search
📋announcedBuilding2025-06-15
DataBank Red Oak Campus
DataBank·480 MW·TX·Red Oak

292-acre campus. 8 buildings x 200K sqft.

Search
📋announcedBuilding2025-06-15
EdgeConneX Austin AUS02
EdgeConneX·96 MW·TX·Cedar Creek

$440M, part of $1.4B campus.

Search
📋announcedPlanned2025-06-15
Equinix Dallas DA12
Equinix·80 MW·TX·Dallas

$836M, 372K sqft, 4-story.

Search
📋announcedBuilding2025-06-15
Prime Fort Worth DFW04
Prime·144 MW·TX·Fort Worth

$1.6B campus.

Search
📋announcedBuilding2025-06-15
Compass Red Oak Expansion
Compass·180 MW·TX·Red Oak

Expanding to 10 buildings, 360MW.

Search
📋announcedBuilding2025-06-15
Tract Caldwell County Campus
Tract·360 MW·TX·Uhland

1,515 acres. 4GW at full buildout.

Search
📋announcedPlanned2025-06-15
Skybox San Angelo Campus
Skybox·250 MW·TX·San Angelo

343 acres, 6 buildings.

Search
📋announcedBuilding2025-06-15
Serverfarm Houston HTX2
Serverfarm·20 MW·TX·Hockley

28401 Betka Rd expansion.

Search
📋announcedBuilding2025-06-15
CyrusOne San Antonio SAT8
CyrusOne·40 MW·TX·San Antonio

Fifth SA campus, 276K sqft.

Search
📋announcedBuilding2025-06-15
Vantage San Antonio TX12
Vantage·48 MW·TX·San Antonio

14720 Omicron Dr, 432K sqft.

Search
📋announcedPlanned2025-06-15
Skybox Round Rock
Skybox·75 MW·TX·Round Rock

29.69 acres near Old Settlers & AW Grimes. 250K sqft.

Search
📋announcedBuilding2025-06-15
Blueprint Georgetown DC
Blueprint Data Centers·25 MW·TX·Georgetown

10-acre, 45K sqft. Phase 1: 12.5MW Q4 2026.

Search
📋announcedBuilding2025-06-15
Blueprint Taylor DC
Blueprint Data Centers·60 MW·TX·Taylor

1601 MLK Jr Dr. 52-acre, 135K sqft, 3 phases. Near Samsung fab.

Search
📋announcedBuilding2025-06-15
QTS South Dallas DFW2 DC2-DC3
QTS·100 MW·TX·Wilmer

303 Mason Rd. DC2: 470K sqft + DC3: 560K sqft.

Search
📋announcedBuilding2025-06-15
Stream DFW-C Wilmer
Stream·240 MW·TX·Wilmer

140-acre campus. Sunrise & Beltline Rd. 1.4M sqft ultimate.

Search
📋announcedPlanned2025-06-15
Iron Mountain Taylor Meadows
Iron Mountain·300 MW·TX·Hutto

500 acres off FM3349. Up to 7 buildings. Near Samsung fab.

Search
📋announcedBuilding2025-06-15
Prime Garland Campus
Prime·120 MW·TX·Garland

$1.3B, 3 two-story buildings. Arapaho Rd.

Search
📋announcedBuilding2025-06-15
Aligned Plano DFW04
Aligned·50 MW·TX·Plano

$161M, 425K sqft. Summit Ave campus expansion.

Search
📋announcedBuilding2025-06-15
CyrusOne Whitney DFW17B-C
CyrusOne·200 MW·TX·Whitney

DFW17B: $500M + DFW17C: $430M. Multi-building campus.

Search
📋announcedPlanned2025-06-15
EdgeCore Shannon Hill Campus
EdgeCore·1,100 MW·VA·Louisa County

$17B, 697 acres, 3.9M sqft.

Search
📋announcedBuilding2025-06-15
STACK NVA02 Campus
Stack Infrastructure·420 MW·VA·Manassas

420MW critical capacity.

Search
📋announcedBuilding2025-06-15
Google Chesterfield Campus
Google·200 MW·VA·Chester

300 acres, 856k sqft, 3 buildings.

Search
📋announcedBuilding2025-06-15
PowerHouse 95 Spotsylvania
PowerHouse·800 MW·VA·Spotsylvania

145 acres off I-95, up to 8 buildings, 3.5M sqft.

Search
📋announcedBuilding2025-06-15
Chirisa Technology Park CTP-01
Chirisa/PowerHouse·350 MW·VA·Chester
📋announcedBuilding2025-06-15
Amazon Mattermeade Tech Campus
Amazon·770 MW·VA·Spotsylvania

1,143 acres, 11 two-story buildings.

Search
📋announcedBuilding2025-06-15
Amazon Warrenton Data Center
Amazon·100 MW·VA·Warrenton

$550M.

Search
📋announcedBuilding2025-06-15
Amazon Culpeper Data Center
Amazon·100 MW·VA·Culpeper
📋announcedBuilding2025-06-15
Peterson Culpeper Technology Campus
Peterson Companies·300 MW·VA·Culpeper

150 acres, up to 9 buildings, 2.1M sqft.

Search
📋announcedPlanned2025-06-15
Iron Mountain Henrico Campus
Iron Mountain·200 MW·VA·Henrico

$1B, 4 buildings.

Search
📋announcedPlanned2025-06-15
QTS White Oak Technology Park II
QTS·240 MW·VA·Henrico

622 acres, up to 13 data centers.

Search
📋announcedPlanned2025-06-15
NTT Gainesville Mega Campus
NTT·336 MW·VA·Gainesville

103 acres, 2M sqft.

Search
📋announcedPlanned2025-06-15
Vantage VA4 Stafford Campus
Vantage·192 MW·VA·Stafford County

$2B investment, 3 buildings, 82 acres.

Search
📋announcedBuilding2025-06-15
Aligned Frederick IAD-04
Aligned·72 MW·VA·Frederick
📋announcedBuilding2025-06-15
TPG Quantum Frederick Campus
TPG Real Estate·264 MW·MD·Frederick

2,100-acre campus, former Alcoa Eastalco site.

Search
📋announcedPlanned2025-06-15
Brightseat Tech Park
Lerner Enterprises·300 MW·MD·Landover

Former Landover Mall, 87 acres, $5B.

Search
📋announcedPlanned2025-06-15
AWS Kline Township Campus
Amazon·200 MW·PA·Kline Township
📋announcedPlanned2025-06-15
CoreWeave Lancaster PA
CoreWeave·300 MW·PA·Lancaster

$6B investment.

Search
📋announcedPlanned2025-06-15
QTS Salem Township PA
QTS·600 MW·PA·Salem Township

1,700 acres, 12-17 DCs. Adjacent to Susquehanna Nuclear.

Search
📋announcedBuilding2025-06-15
HostDime Orlando
HostDime·20 MW·FL·Eatonville

100K sqft Tier IV, 7-story.

Search
📋announcedPlanned2025-06-15
Bohler Fort Meade Campus
Bohler Places·500 MW·FL·Fort Meade

1,100 acres, up to 1.3 GW.

Search
📋announcedBuilding2025-06-15
Hut 8 River Bend Campus
Hut 8·300 MW·LA·West Feliciana Parish

$10B, 592 acres. Near River Bend nuclear.

Search
📋announcedBuilding2025-06-15
AWS Caddo Parish
Amazon·400 MW·LA·Blanchard

Part of $12B STACK-built campuses.

Search
📋announcedBuilding2025-06-15
AWS Bossier Parish
Amazon·400 MW·LA·Benton

Part of $12B Louisiana investment.

Search
📋announcedBuilding2025-06-15
Digital Realty Forest Park
Digital Realty·200 MW·GA·Forest Park

97 acres, Fort Gillem, $3B.

Search
📋announcedBuilding2025-06-15
Equinix xScale Hampton GA
Equinix·240 MW·GA·Hampton

$15B xScale Americas JV. 4 buildings.

Search
📋announcedPlanned2025-06-15
Equinix Minooka Campus
Equinix·700 MW·IL·Minooka

340 acres, first IL hyperscale, 10-year plan.

Search
📋announcedPlanned2025-06-15
PowerHouse Joliet Campus
PowerHouse/Hillwood·450 MW·IL·Joliet

795 acres, 1.8GW at full build.

Search
📋announcedPlanned2025-06-15
AWS Vicksburg
Amazon·300 MW·MS·Vicksburg

$3B investment.

Search
📋announcedBuilding2025-06-15
Google Stillwater
Google·300 MW·OK·Stillwater

Part of $9B OK investment.

Search
📋announcedBuilding2025-06-15
Google Muskogee County Campus
Google·200 MW·OK·Summit
📋announcedBuilding2025-06-15
Google Project Mica KC
Google·700 MW·MO·Kansas City

$10B, 500 acres, 5 buildings.

Search
📋announcedBuilding2025-06-15
PowerHouse Louisville Campus
PowerHouse/Poe Companies·400 MW·KY·Louisville

153 acres, 6 buildings, Phase 1: 130MW Oct 2026.

Search
📋announcedBuilding2025-06-15
Meta Montgomery
Meta·150 MW·AL·Montgomery

$1.5B, 1.3M sqft.

Search
📋announcedPlanned2025-06-15
Project Marvel Bessemer
Logistical Land Development·1,200 MW·AL·Bessemer

$14.5B, 1,600 acres, 18 buildings.

Search
📋announcedBuilding2025-06-15
Vantage NV11 Reno
Vantage·64 MW·NV·McCarran

First of 224MW campus.

Search
📋announcedBuilding2025-06-15
Tract Peru Shelf Storey County
Tract·200 MW·NV·Storey County

686 acres, 810MW at full buildout.

Search
📋announcedBuilding2025-06-15
Google TRIC Reno Expansion
Google·200 MW·NV·Storey County

1210-acre lot.

Search
📋announcedBuilding2025-06-15
AWS Marysville OH
Amazon·200 MW·OH·Marysville

$1B Project Cosmos.

Search
📋announcedBuilding2025-06-15
Meta Aiken County
Meta·150 MW·SC·Aiken County

$800M, 300 acres.

Search
📋announcedBuilding2025-06-15
Google Dorchester County
Google·300 MW·SC·Dorchester County

Part of $9B SC investment.

Search
📋announcedBuilding2025-06-15
Related Digital Cheyenne
Related Digital·302 MW·WY·Cheyenne

$1.2B, CoreWeave 88MW anchor.

Search
📋announcedBuilding2025-06-15
QTS Cedar Rapids IA
QTS·500 MW·IA·Cedar Rapids

$10B campus. 612 acres.

Search
📋announcedBuilding2025-06-15
Google Cedar Rapids IA
Google·300 MW·IA·Cedar Rapids

$7B Iowa investment.

Search
📋announcedBuilding2025-06-15
Meta Kuna Data Center
Meta·200 MW·ID·Kuna

$800M, 960K sqft on 485 acres.

Search
📋announcedBuilding2025-06-15
STACK SVY02A Campus
Stack Infrastructure·48 MW·CA·Santa Clara

1200 Memorex Dr. 4-story, 560k sqft.

Search
📋announcedBuilding2025-06-15
Digital Realty SCL2 Santa Clara
Digital Realty·48 MW·CA·Santa Clara

430k sqft, 4-story.

Search
📋announcedBuilding2025-06-15
Microsoft San Jose Campus
Microsoft·99 MW·CA·San Jose

515k sqft, 64.6 acres. Approved April 2025.

Search
📋announcedPlanned2025-06-15
Goodman Innovation Centre San Jose
Goodman Group·97 MW·CA·San Jose

45.8-acre site acquired for $200M.

Search
📋announcedPlanned2025-06-15
Prologis STEM Park
Prologis·396 MW·CA·San Jose

159-acre RWF site. PG&E 250MW feed.

Search
📋announcedBuilding2025-06-15
AWS Gilroy Data Center
Amazon·98 MW·CA·Gilroy

56-acre site. Phase 1: 49MW.

Search
📋announcedPlanned2025-06-15
AVAIO Project Perseus
AVAIO Digital·99 MW·CA·Pittsburg

CEC approved Dec 2025. $800M+.

Search
Showing 150 of 2,347 events. Use filters to narrow down.